
Project Overview
We were initially approached in 2024 to provide a simple onsite wastewater design to replace the existing system. As the project scope expanded, our role grew to include additional reporting — including an onsite wastewater design that required resource consent.
This project presented unique challenges, with the site located on leased land from multiple property owners and surrounded by water. Despite the complexities, the project was completed successfully, resulting in a significant and rewarding upgrade for this Auckland waterfront business.
Services Provided
Geotech reports
Onsite stormwater mitigation
Onsite wastewater design for resource consent,
Construction monitoring
Project Information
Client
Anonymous
Location
Auckland CBD
Have a project in mind?






